63 Pinner Hightop

Finished up on the handle pocket today. Added a strap to were the handle bolts on to make it a little stronger there it was puckered when I took the handle off. After we got done I bolted the handle back one to check out the conture. Looks good. We get the rest of the bottom we can sling some mud. I ran around the edges on the inside if and water gets in now it will have no place to hide. This would not have happend if they haven't box things in.
 

Attachments

  • IMG_0833.jpg
    IMG_0833.jpg
    509.7 KB · Views: 0
  • IMG_0834.jpg
    IMG_0834.jpg
    562 KB · Views: 0
  • IMG_0836.jpg
    IMG_0836.jpg
    559.5 KB · Views: 0
  • IMG_0837.jpg
    IMG_0837.jpg
    574.5 KB · Views: 0
  • IMG_0838.jpg
    IMG_0838.jpg
    485.7 KB · Views: 0
Back
Top