If they are original, then the bolt anchors will be welded in. If they are replacements, you will find holes in the sheet metal floor, with bolts, washers, and nuts holding them down. In some years, there is actually a separate metal strip that goes on the floor prior to the buckets being installed. It isn't as easy as just drilling some holes, and bolting them down.